Case Study
Shaftsbury Avenue Office
CASE STUDY
Office Shaftsbury Avenue
PROPERTY
Shaftsbury Avenue Office Project – London
DETAILS
250m2 of engineered herringbone with a natural raw oiled finish, stuck down directly to metal pan raised access flooring. Thickness of floor was 10mm to keep the working height in doorways to a minimum.